Attention: Operation of the single centrifuge 2 is possible only in emergency situations ( break-down of separator 1) On the separator diagram: 1. Open the valve 3, 4, 5, 6, 10, 12, 13, 14 ( close valves 7, 8, 9, 11 ) Attention : regulating valves 12 and 13 should be totally open 2. Release brake of centrifuge 2 ( off position ) On the panel control: 3. Set the "Supply pump" switch to position I, 4. Set "Sludge tank pump" to position Auto On the timing unit: 5. Set " Main switch" to position I 6. Push the button "Lamp control" in order to check whether all signal lamps are in proper condition. 7. "Centrifuge 2 " switch on position I Attention : LED - TA lights indicating low fuel oil temperature - press push-button "Alarm confirmation" On the panel control: 8. Set "Pre-heater 2" on position I, Attention: It is possible to turn on the pre-heater only when centrifuge is running. On the timing unit : 9. Switch "Purifier/Clarifier" to position Cl 10. Switch "Automatic control" to position 0 11. Set ts separation time interval between total sludge discharges (depends on the level of fuel oil contamination) - for example: 10 min 12. Set sec time within the adjustment range: 0.01-1.00 seconds for example: 0,50 sec (the bowl may open in case the time set is too long) 13. Set xe counter for selection of the total number of sludge discharges after which flushing is to be carried out ( 1 - 9 ), for example: 4 14. Switch on "Displacement" to position 0 15. Once the bowl revolution has been attained (check current gauge indicator - current should drop to about 7 A) turn switch "Centrifuge program " to position I (confirmed by LED - ~ continuous green light) Attention: Centrifuge program may be switched on after reaching proper fuel oil temperature - signalled by LED TA turning off) 16. After centrifuge program initiation the centrifuge is automatically discharged (LED P will light confirming discharge process realisation) 17. Switch on "Displacement" to position I (fuel oil displacement is applied for the purpose of fuel oil discharge from the bowl before sludge discharge takes place - fuel oil returns to the settling tank - it is not directed to the sludge tank) 18. Set "Flushing" to position I (this option is applied for additional bowl flushing with water after a determined number of sludge discharges - xe ) On the diagram: 19. Set fuel regulating valves 12 and 13 for required flow and pressure value (pressure equal to about 0,3 bars - flow capacity equals to about 500 l/h)
marcin0732