ENGINE ROOM CHECKLIST - ARRIVAL IN PORT
QSMS I-DD08-C02 Rev. No.00
Ship: _________________ Voy. No.: ________________ Date: ___________________
MAIN ENGINE
ARRIVAL IN PORT
01. Change over to diesel oil an hour before the first manoeuvres if necessary *
02. Shut off F.W generator if it was in operation
03. Start and connect an additional Aux. Eng.
04. Reversing test
05. Drain off starting/control system
06. Check Aux. Boiler and set to auto position
07. Check the cylinder lubricators and cyl. Oil level in tank
08. Check L.O and cooling water pressure/temperature
09. Check oil level of turbocharger and M/E sump tank
10. Check oil level in F.O daily tank and drainage
Remarks:
____________________________________
DUTY ENGINEER
* Yes: X ; No: Blank
Note: To be completed every time and filed in ship’s file.
To retain for 2 years.
Issue date: 03.11.2003/Rev. 00 I-DD08-C02 Page: 1/1
wywiadowka