Sultanasection7.pdf

(4144 KB) Pobierz
Sultana.qxd (Page 61)
1
2
3
4
The anchor buoys were made from Sculpey. You
could however, carve them from wood but I want-
ed to continue my experimentation with this
material. A buoy from this time period would
have ranged from 2’ to 4’ long depending on the
size of the ship. I decided on the smallest size
since the Sultana was a small schooner. The
Sculpey was shaped into small beads 3/8” long.
See the photos above for details. Six were made
with the intention of picking the best from the “lit-
ter”. An eye bolt was shaped and inserted into
each end of the buoy. The eye bolts were not
inserted fully (1/32” remained between the buoy
and eye).
how I rigged the buoy to the shrouds first. Then
I set up another length of tan (.008) rigging line
to the anchor as shown in the line drawing on
the previous page. The end was tied to the
shroud at the same place where the line for the
buoy was fastened. To finish it up I lashed a
rope coil to the shroud in that same location. I
must mention that I also placed the anchor cable
on the ring of the anchor before I placed it onto
the model. A generous length of .045 tan rigging
line was used. The other end was run beneath
the head rails and through the hawse hole. I
Place a
rope coil
here
Photo #2 shows how I prepared a harness for
each buoy. Two will be needed for each. Three
lines were knotted along another length rigging
line. It took a little time to space them properly
so there was an equal distance between them.
The harness was wrapped around the buoy and
fused with super glue as described earlier. The
three knotted strands are seized at the eye bolt
as shown in photo #3. The space between these
three lines should be tested before the harness is
glued around the buoy permanently. The same
process was repeated on the other side of the
buoy to complete them. Only this time the three
lines of the 2nd harness were run under the
existing harness before being seized to the eye
bolt on the opposite side. (018 black rigging
lines were used for each harness)
When the buoys were finished I weathered them
with some brown acrylic paint so they wouldn’t
look so new and clean. The photo below shows
522123103.002.png
Eye bolt
Parral beads
Iron bands
Cleats
Sheaves
wrapped it three times around the windlass
drum. Then I pushed the end of the cable into
the corner hole of the hatch directly aft of the
windlass. I was careful not to pull any of these
lines taught. I painstakingly worked them until
they hung loosely and natural. This was not a
simple thing to achieve to my satisfaction but
was well worth the time spent. Finally, each
anchor was lashed to a timberhead as shown in
the same photo.
asked Model Shipways for replacements but I
bought some beech dowels at a local hobby shop
instead. The boom was assembled first and was
very simple. The appropriate sized dowel was
chosen by measuring the diameter against the
plans. The dowel was tapered by hand as shown
in the photo above. The jaws for the boom were
traced from the plans and shaped from a bass
wood sheet 1/32” thick. Small holes were drilled
through the jaw ends so I could string the parral
beads. Drill these holes before you cut the jaws
from the sheet. They will be much too fragile
afterwards and the wood will split. These beads
allowed the boom to move with less friction on
the main mast. They are not supplied with the kit
Boom and Gaffs...
I had to replace all of the dowels provided with
the kit for the boom, gaffs and yards. Most were
badly warped and open grained. I could have
Topping lift (.018)
Tackle for
topping lift
(.008)
3mm single
block
Tackle for
topping lift
belayed here
with rope
coil.
Boom Sheet
(.008 rigging) 4mm
double blocks
Foot ropes
(.008)
522123103.003.png
and were purchased separately. They are sold
several 100 to each package.
Main and fore gaff construction
2.5mm (s)
The boom will be left natural and not painted.
Eye bolts and cleats were attached as shown on
the plans. I also added some black pinstripe
tape to simulate iron bands around the jaws.
This detail is not shown on the plans. Two
sheaves were also simulated at the end of the
boom as shown in the 2nd photo above. It
shows the boom completed and ready to be
rigged on the model. The sheaves are created
by drilling two small holes about 1/32” apart.
The space between them was recessed with the
tip of a pin vise.
(.008)
4mm (s)
2.5mm (s)
eye bolt
on main
gaff only
cleats)
The main and fore gaffs are constructed using the
same methods described for the boom. In this
case they were both painted black before attach-
ing the blocks and eye bolts. Please note that the
main gaff should have an eye bolt glued into the
underside of the jaws. This detail is not shown on
the plans. It will be used for the throat downhaul.
The fore gaff will not have this feature. See the
photo above for details. After they were complet-
ed to the stage shown in the photo I placed them
onto the model. They were secured around the
mast with black parral beads strung through their
jaws. I rigged the main gaff first.
I secured the boom to the main mast so it sat on
the boom rest. The mast hoops should sit on
top of the boom jaws. Then I rigged the topping
lift first. A 3mm single block was seized to the
end of a generous length of .018 black rigging
line. The other end was seized to the eye bolt
on the aft side of the cap. See the photo on the
previous page for details. I carefully adjusted
the length of the topping lift so the single block
was approximately 1 ½” from the end of the
boom. You will have to hold the boom tip above
the transom in order to check that the distance
looks correct. Check the plans to obtain the
exact angle and distances. The tackle for the
topping lift was rigged using .008 tan rigging
line. After running the loose end through the aft-
most sheave of the boom it was belayed to the
cleat on the Starboard side of the boom. It was
finished off with a rope coil.
The rigging for the main gaff was completed in
the order shown below. See the accompany-
ing photos for details. Also examine figure 33
in the kit-supplied instruction manual.
- Peak Halliard - It will be set up with a tackle on
the starboard side and belayed to a shroud cleat.
I seized a 2.5 mm (S) block onto the end of a gen-
erous length of .008 tan rigging line. The other
end was run through the double block on the mast
head. I pulled it through the starboard sheave
until the single block was positioned at a pleasing
height off of the deck. Then I glued the peak hal-
liard in the double block to maintain that position.
It will make it easier to set up the tackle which
was completed next. The other end of the tackle
will be a 2.5 mm (S) block that has a hook drilled
into it. This block will be hooked into an eye bolt
on deck. The position for the eye bolt was taken
from the plans. The hook and eye bolt was
shaped out of 28 gauge black wire. I seized
another length of .008 rigging line to this block to
use for the tackle. This line was run through the
The boom sheet was rigged as shown in figure
34 of the kit-supplied instructions. It is an accu-
rate diagram however it shows the traveller on
deck which is incorrect. A 4mm double block
was seized around the boom for this tackle.
See the detailed photo provided on the previous
page. The running end was belayed to the pin
on the double block (seized to the traveler). A
small rope coil was hung on this pin afterwards.
I used .008 tan rigging line for the boom sheet.
Knotted footropes (.008) were added to the
boom to complete the boom rigging. The knots
were placed the same distance apart as those
for bowsprit foot ropes.
522123103.004.png
single block on the end of the peak halliard and
back down through the hooked block on deck.
The running end was belayed to the shroud
cleat and finished off with a rope coil. The other
end of the peak halliard was run through the sin-
gle block rigged to the gaff. Then it was taken
back up through the double block and seized to
the tip of the gaff as shown in the photo.
Main Gaff Rigging
Peak halliard (.008)
- Peak Downhaul (port) Flag Halliard (Starboard)
I used .008 tan rigging line for both. They were
tied to the boom cleats as shown and then run
through the single blocks seized to the tip of the
gaff. Their loose ends were then belayed to
those same cleats and finished off with some
rope coils.
Flag
halliard
(.008)
Throat
halliard
(.008)
- Throat Halliard – Some tan rigging line (.008)
was seized to the single block attached to the
gaff jaws. This was a little tricky. After a few
attempts I was successful. The running end
was taken through the double block on trestle
tree. Then it was finally brought down to the
deck where it was set up in a tackle on the port
side of the model. This tackle is identical to the
one we created for the peak halliard. Only this
time we will need to seize the 2.5 mm (S) block
onto the running end of this halliard while it is on
the model. I was careful to make sure it was
positioned at the same height above the deck as
Throat
downhaul
(.008)
the block for the peak halliard. See the photo pro-
vided.
- Throat Downhaul - The throat downhaul was
seized to the eye bolt on the underside of the
gaff’s jaws. It was brought down to the boom cleat
shown in the photos provided. Finish it off with a
rope coil. I used .008 tan rigging line for the throat
downhaul.
PORT
STARBOARD
E
D
A
A
B
C
D
B
C
E
A= Throat downhaul B= Peak downhaul C= Flag halliard D= Tackle for throat halliard E= Tackle for peak halliard
522123103.005.png
The fore gaff was rigged in the same manner.
It was secured to the mast with parral beads.
Rigging for the fore gaff was completed in the fol-
lowing order.
Peak halliard
- Peak Halliard – Was completed as described for
the main gaff, only this time the tackle was set up
on the port side of the hull. See the photo to the
right for details.
- Peak Downhau l- The downhaul (.008) was
rigged by tying a generous length of line to the
mast cleat shown in the same photo. It was run
through the 2.5 mm single block seized to the tip
of the gaff. Then I brought it back down to the
same cleat and finished it off with a rope coil.
Throat
halliard
- Throat Halliard - Rigged as described for the
main gaff, only this time the tackle is set up on
the starboard side of the model.
- Vangs - I will hold off on rigging the vangs until
after the yards are completed. They will just get
in the way and make rigging the yards more diffi-
cult. I will describe it in detail afterwards while
finally completing the back stays as well.
Peak downhaul
The Topsail Yards...
The topsail yards were cut to length and tapered
by hand. The measurements were taken from
the plans. If you examine the plans, you will
notice that the yard on the fore mast is longer
and slightly thicker in diameter than the yard for
the main mast. I took this into consideration
when I was constructing them. The tips of the
yard arms were carefully shaped with a #11 blade
in my hobby knife. I scored each end of the yard
by rolling it under my blade. Be sure not to apply
much pressure because you don’t want to cut the
dowel straight through. I only wanted to create a
shallow cut all the way around the yard. Then I
whittled small shavings of wood back to this line.
Two small cleats were shaped from a strip of
wood 1/16” x 1/16’ thick. See the photo on the
next page for details. After they were assembled
I painted both yards black. To finish them off I
seized 2.5 mm single blocks to both ends of the
yards for their braces.
Details of the fore gaff rigging
522123103.001.png
Zgłoś jeśli naruszono regulamin