Instructions(1).pdf

(215 KB) Pobierz
Basilica Administratum Instructions
B ASILICA A DMINISTRATUM
B UILDING I NSTRUCTIONS
Z
w alls
L EFT W ALL (1)
Score, fold and glue. When per-
fectly dry, carefully cut out the
windows and remember to cut in
correspondence of the marks for the
buttresses (14-21) and the
glowglobes (22-23) to be attached.
R IGHT W ALL (6)
Score, fold and glue. When per-
fectly dry, carefully cut out the
windows and remember to cut in
correspondence of the marks for the
buttresses (14-21) and the
glowglobes (22-23) to be attached.
Glue the right wall to the left wall
(1) and let the structure dry.
179134370.001.png 179134370.002.png
f loors
L EFT F LOOR M OUNTS (2-5)
Score, fold and glue. When perfectly dry, glue to the left wall (1) following the indicated numbering.
R IGHT F LOOR M OUNTS (7-10)
Score, fold and glue. When perfectly dry, glue to the right wall (6) following the indicated numbering.
B OTTOM F LOOR (11)
Score, fold and glue. When perfectly dry, glue to the left and right floor mounts (2,3,7,8).
M IDDLE F LOOR (12)
Score, fold and glue. When perfectly dry, glue to the left and right floor mounts (4,9).
T OP F LOOR (13)
Score, fold and glue. When perfectly dry, glue to the left and right floor mounts (5,10).
m iscellaneous Parts
B UTTRESSES (14-21)
Score, fold and glue. When perfectly dry, insert into the small cuts in the left and right walls (1,6).
G LOWGLOBES (22-23)
Score, fold and glue. When perfectly dry, insert into the small cuts in the left and right walls (1,6).
Z
179134370.003.png
Zgłoś jeśli naruszono regulamin